Tuesday, 26 June 2018

Contingancy Plan


This is my contingency plan. I have created this as it allows me to have a, what people call a plan B, just to have behind em incase something falls through or goes wrong with the production. This means I have something to fall back on to if something goes wrong this can include things such as, a back up date, a resulting action if there is bad weather or something becomes broken such as equipment or props during movement. This means that my production will not have to stop and can continue no matter what consequences occur or problems are fetched up during production as i have a resultant plan to fall back on and i will be prepared for  incase something goes wrong.

No comments:

Post a Comment

Evaluation Of Pre-Production